Measurement

Measurement

Site measurement and template control before fabrication.

How It Works

Our measurement team works from architectural drawings and site templates. Openings, level changes and service penetrations are recorded so fabrication reflects the built condition rather than the design intent alone.

  1. 01

    Drawing review

    Coordinated with the project team and recorded in the handover file.

  2. 02

    Site template

    Coordinated with the project team and recorded in the handover file.

  3. 03

    Tolerance check

    Coordinated with the project team and recorded in the handover file.

  4. 04

    Approved set-out

    Coordinated with the project team and recorded in the handover file.

Get a Quote

Send a material request or talk to our export team directly.

Measurement