Measurement
Site measurement and template control before fabrication.
How It Works
Our measurement team works from architectural drawings and site templates. Openings, level changes and service penetrations are recorded so fabrication reflects the built condition rather than the design intent alone.
- 01
Drawing review
Coordinated with the project team and recorded in the handover file.
- 02
Site template
Coordinated with the project team and recorded in the handover file.
- 03
Tolerance check
Coordinated with the project team and recorded in the handover file.
- 04
Approved set-out
Coordinated with the project team and recorded in the handover file.